6
phases of Implementation SAP
1) Preparationà landscape information/
preparation (server info. Cost, how many ppl going to use it etc)
àTeam
size: two teams implementation team and core team
(Project managers and steering committee
from implementation team and core team together called PMO: Project Management
Organization)
àAs
is study: study of current situation, processes, legacy system etc. This is
done by core team.
àAs
is flow chart (tools are Visio, arise etc)
àGather
all the reports
àStudy
legacy system
àInformation
on drawing (handled by Document Management System DMO, also by PP)
àGather
information on interfaces-must have, need to have, nice to have
àDocument
As Is
àSign
off
2) Business Blueprint
(Requirement analyze phase)
àGather
requirement for legacy
àTo
be
àGAP
analysis (difference between as is and to be)
àTo
be process flow
àList
of interfaces to be finalized (must have done now and need to have will be post
go live)
àList
of reports
àRICEFW
objects (Reports, Interfaces, Conversion, Enhancements, Forms and Workflow)-
These are customize reports.
àFunctional
specification- for all RICEFW objects
àTechnical
specification
àSign
off on docs above
àTest
scripts
àTest
cases
àTest
scenario-Simple, complicated and complex
àBusiness
process procedure (ASAP)
àUsing
PowerPoint all functional consultant give a demo
àUsing
PowerPoint presentation give demo only for your module (workshop)
àUsing
800 client give a SAP demo-800 is IDES server (IDES never have customer
information)
àQ&A
database (to be answered by core team)
àOrganization
structure
àCollision
list (material, vendor and customer, unit of measure)
àTo
be documentation
àTo
be sign off (consultant and project manager)
3) Realization
àCarry
out baseline testing in 800 clients
àYou
are provided with a new client 300
àCarry
out basis configuration (back end) - done by consultant
àCopy
of configuration sent to client 300
àTesting
carried out in 200-300 is a golden client; no master data, just configuration
so we cant do testing in 300 (testing by core team)
àYou
are provided with a new client 400 (basic)
àCarry
out additional configuration in 400 (200+400)
àCarry
out configuration in 300
àTesting
carried out in 400 (core team)
àYou
are provided with a new client 600 (sandbox)
àCarry
out additional configuration in 600 (600+200+400)
àCopy
all configurations to client 300
àTesting
carried out in 600
àUsing
client 600
àUpload
master data across all modules (sample load of few parts or entire data end as
per client wants)
àAll
RICEFW objects must be ready tested by you and ready for testing by business
àCarry
out integration testing 1 in client 600 (across all modules)-simple scenario (10)
and complicated scenario (10)
àIntegration
testing 2in 600 (across all modules, group test), complex scenario (5)
àTraining
needs and documents, identify roles and responsibility (based on SOX compliance)
àTraining
client 610 produced by basis
4) Pre go live phase
àSuggest business to
clean up master data in legacy, all configurations from golden client will be
moved to 910, 960 and 999
àMaster
data templates provided by business- if we upload just sample data before then
we need to provide templates here otherwise templates provided when entire data
uploaded in previous phase)
àUpload
master data there are 2 tools: LSMW and interfaces (interfaces like Biz Talk,
tibco, XI etc)
àTraining
session carried out
àYou
are provided with a new client 910 (Development server)
àMaster
data upload into 910
àSometimes
Business carried out integration testing 3
àYou
are provided with a new client 960 (quality and integration test server)
àMaster
data upload into 960
àYou
are provided with a new client 999 (production server)
àMaster
data upload to 999
àCutover
activities (in client 999); when to stop legacy, when to start SAP, when to run
MRP, controlled start up
5) Post production support:
àConfiguration
change
àMaster
data changes
àTransaction
level changes
àSome
more training
àMaster
data to be plugged
àMissing
authorization
àComplete
all documentation work (For both configuration and end use depend upon client)